EA Engineering, Science, and Technology Inc. contracted with BSCI to provide Construction Phase Management-related Engineering Services for the District of Columbia Water and Sewer Authority for the East Side Pumping Station Rehabilitation at Anacostia Park, Washington, D.C. The duration of this project is 803 calendar day and has a value of $12.2 Million. It
consists of the construction of 45 new MGD combination sewer/storm water pumping stations. It included installation of the following:

  • Erosion and sediment controls
  • Erosion and sediment controls
  • Foundation piles and groundwater dewatering system
  • Structural building components
  • Civil site work and utilities
  • Landscaping
  • Four 15 MGD pumps with valves, piping, and process equipment
  • HVAC systems
  • Plumbing systems
  • Architectural features
  • Electrical systems
  • Ductbanks,
  • Force Main
  • Underground vaults
  • Flow diversion structures
  • Interconnection utilities
  • Hazardous materials removal & disposal from within the existing pumping station
  • Demolition & removal of the existing pumping station
  • Project Value: $12.2 million
  • Tanweer Baig, P.E.
    301 Bryant Steet Washington, DC 20001
    202-462-5117 202-306-7205

Get In Touch

    * = Required
    if no entry, SUBMIT does not work

    Brian Smith Construction Inspection, Inc. 1802 Calumet St. Houston TX 77004

    View larger Map