East Water Purification Plant – Plant 3 Administration Building Renovation

BSCI, Inc teamed up with PTI to manage and inspect this project. The project comprised of renovating the Plant 3 Administration Building and installing 240 LF of 42” diameter Steel-Welded Pipe Waterline. The duration of the project was eleven months.

The project involved totally demolishing the third floor interior and rebuilding it with new configuration of offices, control room, lunch room and restrooms. The windows, from level one to three were replaced with new glazing and reinforcements. The wall structural systems were reinforced with buttress walls to sustain high velocity winds.

  • Project Value: $2 million
  • Carroll Leech
    2925 Briar Park Drive, Ste. 950 Houston, TX 77042
    (713) 266-6145