East Water Purification Plant – Plant 1 Sedimentation Basin Drive Replacement
BSCI, Inc and Turner Collie & Braden, Inc teamed up to provide Management and Inspection Services for this project. The duration of the project was two months and consisted of replacing four drives in Sedimentation basins A and B, installing Sludge Level Detectors in Basins A, B, and C and modifying Motor Control Centers to serve the sedimentation system in Basins A and B.
SCOPE OF SERVICES:
- Pre-Construction Support
- Construction Feasibility Assessments
- Daily Construction Inspection
- Documenting Daily Construction Activities with Photos
- Monitor and Confirm Overall Project Compliance



- Project Value: $628,000.00
- Rod McCrary
5757 Woodway Houston, TX 77057
(713) 780-4100