Transportation Infrastructure 

Getting where you need to go has always been a hassle. BSCI has overseen the construction of houston's streets, roadways, bridges  and highways for 30 years. We're making sure the roads most traveled are roads safe to travel.

arrow

Metro Downtown / Metro Street Project

 

The Metropolitan Transit Authority engaged Brian Smith Construction Inspection, Inc., and Raytheon Infrastructure Inc., to provide Construction Inspection, Construction Management and  Civil Engineering services for three projects in connection with its massive street revitalization  program. Duration time for this project was six months. 

Project Scope of Work:

  • New Street Repair
  • Installation of: Underground Utilities
  • Sanitary Sewers & Clean Water
  • Traffic Control Devices  

BSCI & Raytheon Infrastructure, Inc. participated in the following:

  • San Jacinto, Segment 1 (from Walker to Leeland)
  • San Jacinto, Segment 2 (from Leeland to Pierce)
  • San Jacinto, Segment 3 (from Commerce to Walker)